To manage our projects as efficiently and accurately as possible, STEELLEX developed a proprietary tool known as Integrated Project Management System (IPMS). IPMS allow us to integrate data from all of our different management systems, enabling us to gather real-time information on any given piece of steel.
Has material been ordered? Has it arrived? Is the piece detailed? Has it been released for fabrication? If so, where is it being fabricated? What is the status of fabrication? Has it been shipped? Has it reached the destination? For every vital question, we can now find an answer quickly.
Through best in class Integrated Project Management System, you can be assured delivery of your fabricated steel within defined specifications and on the date promised.
Understand Client’s Need
Regular and robust consultation with clients and key stakeholders through scheduled project control meeting and reports. Well-resourced project manager able to work within the client’s time and budget frameworks
Drawing Management
Fast, error-free imports from any detailers’ software avoids false starts on the shop floor with detailed approval tracking, automated revision control, and system-wide access to drawing images for easy reference.
Production Management
Full-featured production management system includes rule-based routing to work areas, batch management, enhanced cut lists and CNC output, progress tracking, shop capacity planning, and more.
Logistic Management
Well-developed logistic plan with compressive packing method to prevent damage, ensure efficient on loading and unload and reduce unnecessary double handling.
Erection Management
Detailed planning and coordination between workshops, clients and other trades to ensure erection tasks are accomplished effectively and safely. We have always followed lean principles such as just in time delivery as an integral part of our fabrication and erection processes.
Hand Over Management
In order to provide progressive assurance and to ensure continual confirmation of compliance with contract specification requirements will generate project contemporaneous records. Hand over documents include quality assurance plan, weld procedures, welder qualifications, inspection and test plans, material testing record, material traceability record, NDT test record, surface treatment record, NDT test, erection record and compliance certificate.